    Clean Room area: 4360M²
    Cleanliness level: CLASS 1K
    Project Description:
    · Clean Room system installation
    · Installation of purification air conditioning system (water system/air system)
    · PCW process cooling water system installation
    · CDA/N2 piping system installation
    · Electrical system and UPS installation
    · Power station air compressor and vacuum system installation
    · Secondary configuration of equipment
    Project time: 2017.04